Application scenario · Banfora, Burkina Faso

A six-tunnel line for Banfora.

The Banfora region produces exceptional mangoes and loses a great deal of them. The processing challenge was five interlocking ones: a harvest arriving faster than anyone could handle, unreliable and expensive grid power, export buyers demanding consistency, traditional drying consuming fuelwood unsustainably, and almost no value addition for growers.

The Banfora configuration — cashew shell to dried mango🌰Cashew shelllocal residue🔥600k burnerpyrolysis♨️Hot-airgeneratorindirect🚋Six tunnels1,500 kg each🥭Dried mangoexport-grade
The Banfora configuration — cashew shell to dried mango
📍 Banfora scenarioDesign setpoint · 118 °C📍 Banfora scenarioIllustrative
The configuration

A complete, residue-fuelled line.

  • 600,000 kcal cashew-shell burner with PLC common panel
  • Hot-air generator — double chamber, three-pass, twin 15 HP balanced blowers
  • Six tunnel chambers — 100mm rockwool, 1,500 kg batch, twelve 3 HP blowers
  • Ducting — 3mm MS with volume-control dampers, 80mm rockwool, MERV-8 filtration
  • Total connected load — 75.5 HP (56.323 kW)
  • Segregated hygiene zones + operator & maintenance training

Projected outcomes (modelled design targets)

  • Processing capacity increased substantially over prior manual methods.
  • Consistent moisture at 12–14% with markedly improved colour retention.
  • Significant reduction in processing energy cost through residue-fuel substitution.
  • Product quality meeting the specification required for European buyers.
  • New permanent positions created for processing operations.
  • Reduced fuelwood consumption relative to traditional drying.

Principles we design around

  • Fuel supply chains need building, not assuming. A cashew-shell burner is only as reliable as the shell supply, so we scope collection arrangements with nearby processors alongside the equipment.
  • Training depth determines outcomes. The gap between a well-run and a poorly-run line is operator competence, not equipment specification — so training is part of the supply.
  • Preventive maintenance must be scheduled, not intended. We hand over written schedules with named responsibility, or it does not happen.
  • Local adaptation is unavoidable. Design assumptions are confirmed against a site survey before manufacture.

The figures above are modelled design targets for this configuration, not measured results — we have not yet built this line. They are confirmed against a site survey and a real fuel sample before manufacture.