Insulated panel rooms under a steel shed.

Our panel-room configuration builds the drying line from insulated Rockwool sandwich-panel rooms on a concrete slab inside a light steel (PEB) shed — conventional cold-store construction, food-grade, and free of any container-size constraint.

Per-chamber recirculation loop inside the panel room♨️Central heatplant600k kcal📥Supply to roomper chamber🗄️Trays & wagons368 trays💧Moist return airpicks up water🔁Recirc fan~13,000 m³/h
Per-chamber recirculation loop inside the panel room
Two configurations, one platform. We build the drying stage either as continuous tunnel dryers or as the panel rooms described here. Both run on the same central cashew-shell heat plant; the choice is driven by site, volume and batch-handling preference.

Process

Prepared mango (washed, peeled, sliced, pre-treated with a citric/ascorbic or sulphite dip) is loaded onto trays, trays onto wagons, and wagons rolled into a room on floor rails. The room is sealed and hot air is recirculated through the tray stacks at 55–75 °C for a 14-hour batch until the fruit reaches 12–14% moisture. Operation is single-side-door, first-in-last-out — the whole room loads and unloads as one batch.

Capacity

Rooms6 panel rooms, internal envelope 5.90 × 2.35 × 2.39 m
Wagons per chamber8 (2 abreast × 4 rows)
Trays per wagon46 (23 levels × 2)
Trays per chamber368
Tray area per chamber165.6 m²
Capacity per chamber828 kg fresh / batch
Line batch capacity4,968 kg fresh mango / batch (≈497 kg dried)
Loading density (design)5 kg fresh / m² tray

Room design & construction

ElementSpecificationReason
Walls & blind end50 mm Rockwool sandwich panel, 100 kg/m³, TCT skinsNon-combustible A1, near a biomass plant
Ceiling80 mm Rockwool sandwich panelLarger loss face; suspended from PEB purlins
FloorInsulated slab + 1.5 mm SS 304 wearing sheet, seam-welded, covedFood-grade, washable — no timber anywhere
DoorsInsulated panel door, EPDM gasket + drop seal, single sideFirst-in-last-out batch loading
PEB shedLight steel portal frame + roof sheeting over both wings + plantRoof, weather envelope, shade
Air-seal bafflesSpring-loaded flaps, sides + topStop air short-circuiting the wagons
Why panel rooms. The panels ship flat-packed (efficient freight) and are erected on site, so room size is not limited by a container; the floor is a clean concrete slab with an SS 304 wearing surface — avoiding the pesticide-treated timber floor a container shell would bring. The trade-off: a building must be erected on site.

Trays & wagons

Trays and wagons are supplied in SS 304 — aluminium is rejected because mango is acidic (pH 3.4–4.5) and the dip chemistry would breach EU aluminium-release limits.

  • Tray — 900 × 500 × 25 mm; SS 304 angle frame with perforated deck.
  • Wagon — 1000 × 1050 × 1890 mm; SS 304; 23 levels at 70 mm pitch; 46 trays; flanged rail wheels.
  • Shipping — wagons ship knocked-down and are assembled on site.

Airflow — per-chamber recirculation

Each chamber is a closed recirculation loop: a fan at the blind end pushes hot air through a supply plenum, down through the tray stacks, turns it at the door end and returns it over a top plenum — so no return ducting is needed. A small make-up stream of hot air is mixed in, and an equal moist fraction exhausted.

Circulating air per chamber~13,000 m³/h
Air velocity over trays~2.0 m/s
Temperature drop across load~9 K (65 → 56 °C)
Exhaust fraction~13% (sets chamber humidity)
Recirculation fan5 HP / chamber
Exhaust fan1 HP / chamber, motorised damper
Connected load, whole line~56 HP (vs 75.5 HP for a full-flow design)

Controls

  • Master PLC controls burner, hot-air generator and all six chamber zones, with a hard interlock capping tray-face air at 65 °C.
  • Per chamber: two PT100 sensors, an RH probe, recirculation and exhaust fan control, door switch and IP65 lighting.
  • Each chamber runs as an independent zone, so batches can be staggered rather than all six moving together.
  • MERV 8 pleated filters on the make-up air intake.

Panel rooms or tunnels — we’ll advise.

Tell us your site, batch volume and handling preference and we’ll recommend the drying configuration that fits.

Discuss your line